Learn About The Equipment Installation And Commissioning Of The Mixing Tank

Equipment installation and debugging of mixing tank

1. Please check whether the equipment is seriously damaged or deformed during transportation, and check whether the fasteners of the equipment are loose, and contact our company in time!

2. Please use pre-embedded anchor bolts to install the equipment horizontally on a stable basis.

3. Please carry out the correct installation of equipment, electrical control devices and accessories under the guidance of professionals, and check whether the pipeline is smooth, whether the installed instruments are correct, and whether there is any damage. Before starting the device, please check whether the device is affected inside and outside the device and around it.

A functioning person or object is present to avoid danger.

4. After installation, please do a test run for a few seconds first, and make sure that there is no electrical short circuit or abnormal sound, before you can carry out a short test run.

5. If the mixing tank is equipped with a mechanical seal, an appropriate amount of 10# or sewing machine oil must be injected into the mechanical seal lubrication groove before the main engine is started, and cooling water must be introduced into the mechanical seal cooling cavity, so that the mechanical seal device can operate well. lubrication and cooling. The mechanical seal is not adjusted at the factory,

After the installation is completed, adjust the mechanical seal to a good position according to the installation and operation instructions, and then it can run normally (according to the user's needs).

6. After the equipment is in normal operation, please check the bearing temperature, smoothness of operation, tightness, etc., and whether the instrument is normal. After confirming that it is normal, it can be put into operation.